The new tower launched in Birla Punya brings ultra-luxury 1 BHK, 2 BHK, 3 BHK, 3.5 BHK, and 4.5 BHK apartments to Sangamwadi, Central Pune. This premium residential complex sits on a prime 5.75 acres land parcel along Station Road, near the RTO Office. Buyers can now choose from highly ventilated homes designed for a modern lifestyle. The development blends vast green spaces with high-rise structural engineering.
This landmark property features a highly planned structure of high-rise towers with 3B+G+24 floors. The expansion introduces 1 new tower to the existing complex of 4 towers. Across the entire 5.75 acres area, the project houses approximately 344 smart apartments. Residents will enjoy massive open space as 79% of the land is reserved for greenery, parks, and beautiful landscaping. The project is highly safe and official, carrying the RERA number P52100079533.
The apartments cater to various family sizes and specific space requirements. Below is the complete list of sizes and costs for the inventory.
| Unit Configuration | Carpet Area (Sq. Ft.) | Pre-launch Price (INR Cr* Onwards) |
|---|---|---|
| 1 BHK | 485 – 490 | ₹0.90 – 0.94 Cr* |
| 2 BHK | 875 – 909 | ₹1.67 – 1.78 Cr* |
| 2 BHK XL | 1180 | ₹2.65 – 2.71 Cr* |
| 3 BHK | 1451 – 1465 | ₹3.20 – 3.32 Cr* |
| 3.5 BHK XL | 1629 | ₹3.62 – 3.71 Cr* |
| 4.5 BHK | 1805 | ₹4.03 – 4.22 Cr* |
The brand-new inventory includes structural upgrades and incredible social hubs. Residents get immediate access to top-tier physical infrastructure.
The project is located at Plot No. 90, Sangamwadi, Station Road, near the RTO Office, Maharashtra 411001.
The entire residential luxury apartment complex is spread across 5.75 acres of land.
The project dedicates 79% of the total land area to greenery, landscaped gardens, and open parks.
The official approved RERA registration number for this real estate project is P52100079533.
The high-rise towers feature a building structure of 3B+G+24 floors.
The apartment sizes range from 485 sq ft for 1 BHK up to 1805 sq ft for 4.5 BHK units.
The construction of the project is scheduled to reach full completion in July 2029.
The targeted final possession date for apartment owners is September 2029.